ZAM-YYYY-NNNN, for example ZAM-2026-0005. The app assigns it in sequence per company and year, and it can’t be changed.
Where do orders come from?
A quote always belongs to an order. One order can hold several quotes, for example two material variants of the same part for the same client. So an order is created in one of three ways:- From the order list, with New order. Start here when a job comes in without a quote, or when you want to collect drawings and agreements first.
- From a new quote, with the Create a new order from this quote switch. When you save the quote, the app creates an order with the quote’s name, client, dimensions and material, and the first entry in that order’s history reads “Order created from quote
WYC-…”. - From the Order field of a quote, through Add new order. The order is saved right away, even if you then drop the quote.
Create an order
1
Open the form
In the menu, choose Orders and click New order in the top right corner.
2
Type a title
In Order title, name the job the way the shop talks about it, for example “Spacer sleeves Ø30, batch of 200”. It’s the only required field, and the list search looks in titles, so make it specific.
3
Set the properties (optional)
In the bar under the title, pick Status, Priority, Deadline, Assignee and Payment. If you leave the status empty, the order is saved as Offer. Priority starts at Trivial and payment at Unpaid.
4
Add details (optional)
Fill in Order description, for example inspection requirements, and pick a Client and a Project. The buttons below add dimensions, a task list, files and dependencies. You can add all of this later too, as described in Working on an order.
5
Create the order
Click Create order in the top right corner. You’ll see “Order created successfully.” and the order opens with its number. From now on, every change saves itself.


Track an order’s progress
The bar under the order title tells you in one row what stage the job is at, when it’s due, who leads it and whether the client has paid. Click a value and pick a new one; the change saves right away, with no save button. Every change is also logged in the order’s history in the Activities panel.
What do the statuses mean?
An order has one of eight statuses: Offer, Accepted, In progress, On hold, Canceled, Overdue, Done and Archived. You set them by hand, in any order, and none of them locks editing, so you can still correct an order after marking it done. A few rules are worth knowing:- Overdue isn’t set automatically when the deadline passes. Instead, the app reminds you with the Deadline approaching (2 days before) and Order overdue notifications, as long as the order isn’t Done or Canceled. How to control them is covered in Notifications.
- The order’s status and the statuses of its quotes are independent. When the client accepts a quote, move the order to Accepted yourself.
- Archived hides the order from the list and archives all its quotes with it. That’s how you put finished jobs away without losing their history.
Find an order on the list
The order list is split into groups by status, with the newest orders at the top of each group. Each row shows the number with a priority icon, the title, project, status, deadline, client and the person leading the order. Click the title or Open to go into the order.
- Search orders (magnifier icon) looks for part of a title. It won’t find an order number or a client name: use the Client filter for that.
- The Project, Status, Priority, Client and Assignee filters let you tick several values at once. They only list values that occur in your orders.
- Group by arranges the list by status, priority, client, project or person, and No grouping shows a single list.
- Sort changes the order, for example by deadline, and Direction flips it.
- Manage columns (gear icon) shows the extra Priority, Qty and Material columns.

Change several orders at once
Tick the checkboxes at the start of the rows. A bar appears at the bottom of the screen with the number of selected orders and three actions:- Change status sets one status on every selected order, for example when a whole batch moves to Done.
- Create project puts the selected orders in a new project. It works when they all have the same client, or none. More in Projects.
- Delete orders deletes the selected orders for good.

Delete an order
Delete orders created by mistake. Finished jobs are better archived, because their history stays. Hover over the order on the list, click the three-dot Actions icon and choose Delete order. The dialog tells you how many quotes go with the order. Confirm with Delete. If the deleted order was the last one in its project, the app asks what to do with the empty project. See Projects.Who can change orders?
Orders are available on every plan, with no limit on the number of orders. Anyone whose role includes the Orders module can view and comment on them. Creating, editing, changing the status and deleting need the Edit production data permission. Without it, you’ll see a View only badge in the order and the buttons and fields are disabled. Ask the company owner for access. What each role can do is covered in Roles and permissions.
What’s next?
Working on an order
Add dimensions, tasks, drawings and dependencies, and discuss details in comments.
Projects
Group several orders of one client in a project.
Create a quote
Price a part and link the quote to an order.